house-iconCONSULTATION IN-HOME
Anywhere in Toronto & the Greater Toronto Area
BOOK NOW

If you love your home but need more room, a second-story addition (also called a second floor addition, upstairs add-on, or bungalow top-up) can nearly double your living space without uprooting your family.

Instead of squeezing into a too-small main floor or house hunting in today’s tough market, you can build up and create the extra bedrooms, bathrooms, or office space you’ve always needed.

Second Story Addition Pricing

Pricing begins at $300 per square foot, depending on materials, design and seasonal use.

Why Families Across Toronto Choose a Second-Story Addition

  • Stay in the neighbourhood you love– Avoid the stress of moving schools, leaving friends, or giving up your community.
  • Add bedrooms, baths, or even a full primary suite- A second floor gives flexibility for growing families or multigenerational living.
  • Maximize your lot- Perfect for smaller Toronto lots where building out isn’t possible.
  • Boost resale valueA well-planned two-storey extension can recoup 60-65% of costs at resale 
  • Customize for your future– Whether it’s a home office, rental suite, or upstairs laundry, you’re building to fit your lifestyle.

What’s Involved in a Second-Story Build? A Step-by-Step Guide

We’ve refined our process over 15+ years and 200+ projects. From first consultation to final walkthrough, here’s exactly what to expect—clear, predictable, and stress-minimized.

1. Feasibility & Structural Assessment

  • Engineer inspects foundation, walls, roof, and soil
  • Determines if reinforcements (e.g., underpinning) are needed
  • Free preliminary evaluation included

2. Design & Permit Approval

3. Roof Removal & Framing

  • Existing roof carefully removed
  • New second floor framed with engineered lumber
  • Home and yard protected with temporary enclosures

4. Stairwell & Circulation

  • Strategically placed staircase for natural flow
  • Designed to preserve main-floor function
  • 3D preview provided before cutting

5. Mechanicals: Electrical, Plumbing & HVAC

  • Electrical circuits extended or upgraded
  • Plumbing lines run for new bathrooms
  • HVAC ducted or mini-splits installed for comfort

6. Insulation, Drywall & Finishes

  • High-efficiency insulation (R-20 walls, R-50 roof)
  • Drywall, trim, flooring, paint, and fixtures installed
  • Matched to your existing style or fully modernized

7. Exterior & Final Inspection

  • Siding, roofing, and trim matched seamlessly
  • City of Toronto inspections scheduled and passed
  • Certificate of Compliance issued-project complete!

Zoning, Setbacks & Neighbour Considerations: Build Smart from Day One

Before we draw a single line, we make sure your second-storey addition meets Toronto’s zoning rules so your project gets approved fast and avoids costly changes.

Using the City’s Preliminary Zoning Review and Property Information Report (PIR), we confirm:

  • Maximum building height (critical for two-storey additions)
  • Required side, front, and rear yard setbacks
  • Lot coverage limits (how much of your property can be built on)
  • Easements or restrictions (e.g., hydro corridors, shared walls)

What About Neighbours?

The City may notify adjacent property owners if your addition:

  • Overlooks their yard
  • Affects natural light
  • Requires work near a shared lot line

We help you:

  • Review potential sightlines early
  • Adjust window placement if needed
  • Communicate professionally (if required)

💡 Pro Tip: Addressing neighbour concerns upfront prevents delays and keeps relationships positive.

Learn more: Apply for Zoning Review & Get Building Records – City of Toronto

Why Homeowners Choose Us for Second Floor Construction

We make second-story additions simple, compliant, and stress-free because we know Toronto’s rules, timelines, and neighbourhoods like the back of our hand.

  • We Know the City’s System

We file permits daily with the City of Toronto Building Division and track every step- from application to final inspection so you don’t have to.

  • No Surprises on Zoning

Before we design, we pull your Preliminary Zoning Review and Property Information Report (PIR) to ensure your addition meets height limits, setbacks, and lot rules avoiding costly re-draws.

  • Full OBC Compliance Built In

Every plan is reviewed for Ontario Building Code compliance. We schedule and pass all mandatory inspections- framing, rough-in, insulation, final with zero shortcuts.

  •  We Handle the Details

– Permit applications & City correspondence

– Inspection tracking & status updates

– Neighbour notifications (when required)

– Tree protection & site safety

All while following Toronto’s noise, safety, and construction bylaws.

  •  Design + Build. One Team. No Handoffs.

No juggling architects, engineers, and contractors. We manage everything in-house so your project stays on time, on budget, and fully coordinated.

Why Choose Us

Here's why people love to choose us for their reno:

Deomax Group Testimonials

We had the guys from Deomax redo our kitchen for us and we could not be happier with the work.

We have a more modern kitchen now that is far more functional than our old design.

Dennis T.

I called Deomax to help me with our basement, and I am so glad that I did. They gave us an incredible and beautiful space.

Couldn't recommend them enough.

Tracey B.

Deomax did an amazing job in the bathroom in our master bedroom. They made it way more functional for us.

I would recommend them to anyone. Thanks guys!

Thomas R.

Highly recommend! Completed my kitchen remodelling with Deomax and am very happy with the results. Workmanship is top notch (even the small details like electrical and plumbing done to maximize space) and they completed all the work on time. Thank you so much!

Sunny L.

Reached out to Dmytro from Deomax Group with commercial washroom project. He was prompt on response, professional and fast. Project from start to end went smooth and I am very happy with the work and final results. Thank you to Dmytro and his crew, will definitely call for the future projects. Highly recommend!

Daniil V.

Frequently Asked Questions About Second Story Additions

Adding out can be cheaper if you have the lot size. But in Toronto, where lots are small, going up is often the only option and while pricier per square foot, it maximizes value.

Yes, but only if the foundation and structure can support the load. Engineers will assess and recommend reinforcements if needed.

 

Often in a central hall or near an existing stairwell. We design stairs to feel seamless and not disrupt your main floor.

A structural engineer must test soil bearing capacity, wall strength, and footing size. We handle this step before any build begins.

For a second-storey addition, the average review time is 8 to 12 weeks, depending on the complexity of the project and current City processing times.

Factors that can speed up or delay approval:

  • Completeness of submission (missing drawings = delays)
  • Need for zoning review or variances
  • Requests for additional information from City reviewers

We ensure your application is 100% complete and code-compliant to avoid delays.

The City of Toronto requires several inspections at key stages of construction to ensure safety and compliance with the Ontario Building Code:

 
 
Framing
After walls, floors, and roof are framed, before drywall
Rough-in (Mechanical)
Before insulation, for electrical, plumbing, HVAC
Insulation & Vapour Barrier
After insulation is installed, before drywall
Final Inspection
Once all work is complete and ready for occupancy

We schedule all inspections and ensure your project passes each one. You can track inspection status online through the City’s portal.

The City may automatically notify adjacent property owners if your project:

  • Is near the property line
  • Involves a shared wall (semi-detached)
  • Could impact privacy, light, or views

While not always required, we recommend a friendly heads-up to maintain good relationships. We can help draft a simple notice if needed.

Use the City of Toronto’s online permit and inspection tracker to view real-time updates:

Search Permit Applications & Inspections – City of Toronto

We’ll give you the application number and guide you through the portal so you can follow your project’s progress anytime.

Call for a free estimate